会议专题

Test Analysis on Hidden Defect in High Falsework and Its Effect on Structural Reliability

In China, the safety of high falsework is a worrying problem, and human error is the uppermost reason for the collapse of falsework.In this paper,on the bases of test data of axial forces of vertical bars of the falsework in a construction site, a phenomenon of improper erection of vertical bar (IEVB) is described and analyzed.The effect of IEVB on structural reliability is discussed, and the results show that IEVB will make an order of magnitude increase in the failure probability.The reliability index of the high falsework does not meet the requirement of corresponding code, and more attentions should be paid to the construction of high falsework.

Structural reliability falsework hidden defect insitu test human error test analysis

Nan Xie Gang Wang

School of Civil Engineering Beijing Jiaotong University Beijing,China School of Civil Engineering Beijing Jiaotong University Beijing,Cliina

国际会议

2009 8th International Conference on Reliability,Maintainability and Safety(第八届中国国际可靠性、维修性、安全性会议)

成都

英文

1077-1080

2009-08-24(万方平台首次上网日期,不代表论文的发表时间)