会议专题

A SCHEDULING METHOD FOR HYBRID FLOWSHOPSCHEDULING PROBLEM: PROPOSAL OF THE CHAIN ASSIGNMENT OF JOBS BY EARLIEST STARTING TIME

This paper targets the Hybrid Flow Shop scheduling problem, which consists of series of production stages, each of which has multiple machines operating in parallel. This problem is difficult to be solved because of its problem size and structure. An assignment rule ‘Chain Assignment of Jobs by Earliest Starting Time is proposed to downsize the problem without lost of the optimality. In the computational experiments, the proposed method shows its optimality by being compared with the Johnsons rule, and other previous methods.

scheduling simulatedannealing.

Shunichi.OMORI.Author Kazuho.YOSHIMOTO

Department of Industrial and Management Systems Engineering, Waseda University, Room No.51-15-05 3-4 Department of Industrial and Management Systems Engineering, Waseda University,Room No.51-15-05 3-4-

国际会议

第二十届国际生产研究大会

上海

英文

1-6

2009-08-02(万方平台首次上网日期,不代表论文的发表时间)