RESEARCH ON THE WORKSHOP PRODUCTION ABOUT MULTI-RESOURCE CONSTRAINTS
Workshop production scheduling problem is finding the best production program about the assignments of processing workshop and determining the workshop of the production resources how to allocation, it is a typical optimization problem. The optimization model of workshop production can be divided into Singleresource constrains and multi-resource constraints. In this paper, the optimization model of work production about multi-resource constraints is our concerned. Finally, in accordance with the corresponding data, we will use optimization algorithm to obtain the satisfactory solution.
multi-resource constraints workshop production optimization model
Xu Zheng
Wuhan University of Technology, Hongshan District of Wuhan City Luo Shi Road 122,Wuhan,Hubei Province, China.
国际会议
上海
英文
1-4
2009-08-02(万方平台首次上网日期,不代表论文的发表时间)