会议专题

SEQUENCING OF JOBS IN A CONWIP SYSTEM

This paper considers the loading of jobs in a flow line using a CONWIP system. It is shown that the sequence in which the jobs are processed is important in determining the optimal WIP level. A lower bound on the WIP level is developed, which can then be used to determine the desired (minimum) WIP level and the cyclic sequence in which to load the products so as to maximize throughput.

CONWIP flow line sequencing mazimize throughput.

Subhash C. Sarin

Virginia Tech, Grado Department of Industrial and Systems Engineering 250 Durham Hall, Blacksburg, VA 24061, USA

国际会议

第二十届国际生产研究大会

上海

英文

1-5

2009-08-02(万方平台首次上网日期,不代表论文的发表时间)