Research on integrated scheduling of refinery hydrogen network with hydrogen inventory
Hydrogen network is the key part in crude oil refinery process, which has such features as large scale, complex process. It is very difficult to formalize and optimize the network. This paper presents bi-objective model for the scheduling problem of the hydrogen network. NSGA-II algorithm, which is adopted to solve our model, gives out the Pareto set. Then C2R method can be used to evaluate the Pareto solution in the set. Computational experiments based on the data from certain refinery facotry demonstrate the effectiveness and feasibility of the scheduling mothodelogy.
Hydrogen Network Scheduling Multiobjective NSGA-II C2R model
LUO Xiao-chuan REN Tao LIU Yan
Key Laboratory of Process Industry Automation (MOE), Northeastern University, Shen Yang 110004, China
国际会议
2009年中国控制与决策会议(2009 Chinese Control and Decision Conference)
广西桂林
英文
2599-2604
2009-06-17(万方平台首次上网日期,不代表论文的发表时间)