An Active Plan based Critical Chain Method

For some projects, to void the risk of project delay, the all the tasks should be finished as soon as possible. However, the critical chain method (CCM) requires the non-critical tasks to be executed as late as possible. Therefore, adopting the merits of CCM and improving it to schedule project tasks as early as possible is a meaningful work. In this paper, a new critical chain method called active plan based critical chain method is presented. Other than the old one, the new CCM is created based on the active plan, that is, all tasks should be executed as early as possible. And then, the schedule scheme of active plan based critical chain method is given, including searching critical chain, no-critical chain and setting buffers. By a project case, the schedule scheme is illustrated, and the effectiveness of the schedule scheme is verified.

project management critical chain method planning and scheduling

Chen Ming Peng Wuliang

Modern Educational Technology Center, Shenyang Ligong University, Shenyang, 110168,China School of Economics and Management, Shenyang Ligong University, Shenyang, 110168, China

国际会议

2009年中国控制与决策会议(2009 Chinese Control and Decision Conference)

广西桂林

英文

2765-2769

2009-06-17(万方平台首次上网日期,不代表论文的发表时间)