会议专题

Research on multi time periods procurement plan of supply chain under production demands uncertainty

Considering the uncertainty of production demand, a problem of multi time periods procurement plan of supply chain under production demands uncertainty was studied in this paper. According to characteristics of the problem, a real number matrix encoding and stochastic sampling constraints verifying based PSO algorithm was proposed. A numeric example is performed, and the results illustrate the feasibility and the effectiveness of proposed model and algorithm.

supply chain multi time periods procurement plan demands uncertainty stochastic chance-constraint programming PSO algorithm

Pang Hali Wei Yongjun Chen Caixia Duan Jian

College of Information Science & Engineering Northeastern University Shenyang,Liaoning 110004

国际会议

2009年中国控制与决策会议(2009 Chinese Control and Decision Conference)

广西桂林

英文

4968-4971

2009-06-17(万方平台首次上网日期,不代表论文的发表时间)