会议专题

Construction and Implementation Curriculum System of High-speed Railway Technology Professional

High-speed railway technology, in close connection with their professional characteristics, the depth of school-enterprise integration, in the professional building, the CEC-CD1O (Conceive-Design-Implement-Operate), depth exploration of the mode of education and practice, and so to build the course system, the project as a carrier of 7-Week Learning Period System of teaching organizations, combined with engineering practice, to obtain good results.

7-Week Learning Period System CDIO Teaching Organization Teaching Methods Teaching Organization

LI Lizeng SUI Xiuzhi

Transportation Department, Shijiazhuang Institute of Railway Technology, P.R.China, 050041

国际会议

2009 International Conference on Education Management and Engineering(2009教育管理与工程国际研讨会)

河南焦作

英文

722-726

2009-06-01(万方平台首次上网日期,不代表论文的发表时间)