Super High Voltage Building Power Transmission Mode

Fix the power transmission tower on the roof of the building about 15-150 m, applying reinforced power transmission facilities and building intensity, buildings are still able to be built (available) under the power transmission lines, this has enabled a full utilization of the rich and cheap space of 15-150 m from the ground and thus saved the land resource. This has realized a relatively easier selection of the routes of power transmission lines, a smooth, convenient and economic entering of the high voltage power distribution lines, high voltage power transmission lines and ultrahigh voltage power transmission lines into the center region of load, especially it has eliminated the conflicts between the huge load requirements and the shortage of the power transmission lines corridors in the center region of load in megacities and metropolises, even there is no need to reserve and maintain intentionally a large number of power transmission channels in megacities and metropolises. It is in violation of the regulations but scientific. It is qualified in the aspects of environment, reliability, safety, maintenance, operation, construction and quiver-proof. In addition: the power supply system in megacities and metropolises are applying a voltage of 22-25KV (economic voltage) or the sky will be full of ‘cobweb.

Routes of power transmission lines buildings land saving utilization of space resources safety economy carbon fiber composite core conductor optimization of resources configuration in violation of the ezisting regulations

YUAN YICHENG YUAN YIQING

Dalian Thermal Power Group Co.,Ltd.,Beihai Thermal Power Plant,210 Xiangzhou Road Dalian Power Supply Company,Zhongshan Branch,No.1 Erqi Square,Dalian

国际会议

2008 China International Conference on Electricity Distribution (CICED 2008)(2008中国国际供电会议)

广州

英文

1-6

2008-12-10(万方平台首次上网日期,不代表论文的发表时间)