Short-period Aeration Pilot Tests in Wuhan Shahu Wastewater Treatment Plant
Short-period aeration method is to shorten aeration time effectively by reducing the number of running aeration tanks on the basis of traditional activated sludge process. The optimal working condition has been determined by short-period aeration pilot tests in Wuhan Shahu Wastewater Treatment Plant. The results of tests show that the effluents of the secondary sedimentation tanks can meet the sewage discharging standards and a lot of costs can be greatly saved.
municipal wastewater traditional activated sludge method short-period aeration pilot tests
Jianhua Jin Yinghe Jiang Xiahui Wang
School of Civil Engineering & Architecture Wuhan University of Technology Wuhan, P. R. China
国际会议
上海
英文
2890-2893
2008-05-16(万方平台首次上网日期,不代表论文的发表时间)