会议专题

Study on Removal of Nitrogen and Phosphorus by the Integrated Intermittent-aeration Membrane Biological Reactor

Pollutants removal efficiency of the Integrated Intermittent-aeration Membrane Biological Reactor (MIBR) was investigated in this paper. And four different working conditions were researched by the laboratory-scale experiment. The results showed that the working condition III in which the periods of aeration and agitation are 2h and 2h was considered optimal for under this condition the pollutants removal efficiency of MIBR were better. Under the condition of the optimal working condition, the concentrations of COD, TN, NH4 +-N and TP in the effluent of MIBR were 12.55-40.92 mg/L, 3.66-10.10 mg/L, 0.50-6.89 mg/L and 0.18-0.98 mg/L respectively. It indicated that effluent quality of MIBR could meet the standard of the reused water quality criterion (CJ/48-1999).

municipal wastewater integrated intermittentaeration membrane biological reactor nitrogen and phosphorus removal

Xiejuan LU Beiping ZHANG Lixiang LIU Shuangju LI Zhenpeng FENG

School of Environmental Science and Engineering Huazhong University of Science and Technology Wuhan 430074, China

国际会议

The 2nd International Conference on Bioinformatics and Biomedical Engineering(iCBBE 2008)(第二届生物信息与生物医学工程国际会议)

上海

英文

3451-3454

2008-05-16(万方平台首次上网日期,不代表论文的发表时间)