会议专题

SUSTAINABLE DESIGN BASED ON NEAR NATURE CONSTRUCTION METHOD-A CASE STUDY

To meet the demands in both flood control and nature conservation, near nature construction method was adopted for the river restoration on downstream of Fazih River. The project was performed following the procedures: (1) ecology investigation, (2) basic hydrological information collection, (3) riverbed and embankment design, (4) nature conservation design, and (5) construction. Special features include guiding river flow with low jetties to generate fish habitat, using Ryushikou method to build revetment covered with densely populated vegetation, afforestation for heron nesting. A rough post construction evaluation showed satisfactory results are achieved thus far.

river restoration revetment embankment ecosystem habitat

Huat-Yoo CHUA Hsiao-Chou CHAO Chung-Tien CHIN

Taichung MRT Special Project, Moh And Associates, Inc., Taiwan, China Moh And Associates Inc., Taiwan, China

国际会议

International Symposium on Geoenvironmental Engineering(国际环境岩土工程研讨会

杭州

英文

901-906

2009-09-08(万方平台首次上网日期,不代表论文的发表时间)