CHANGE OF MINING TECHNOLOGY IN A GERMAN ROCK-SALT MINE
Since mining commenced in 1885 the mining method in the Heilbronn rock-salt mine has been drilling and blasting. In May 2006 a first Continuous Miner from Sandvik was put into operation. The introduction of continuous mining required changes in the working system, the haulage and the infrastructure. In the year 2008 the miner produced one million tonnes and replaced a blasting section. The positive results of the new mining method gave encouragement to order a second machine that was delivered in November 2008. The change of mining technology from blasting to cutting was successful and will be continued in the next years.
salt production rock-salt mining drilling and blasting continuous mining
Gerd P.Bohnenberger