会议专题

Study on the capacity ezpansion and energy saving modifications of brine transportation pump station at Huaiyin

Through investigation and study on the brine pipeline from Huaiyin to Lianyungang and on the basis of testing the running of several pumps in parallel connection in the first station. This paper points out that transportation capacity can be increased only when intermediate pump station is set up. The resistance calculation suggests that the modification on the pipeline with transportation capacity of 600×104m3/a and the design of intermediate pump station is an optimal choice, and in the meantime the maximum brine transportation capacity is fixed. In addition, a closed-circuit brine transportation system is more economic and rational based on the analysis on the pros and cons of the transportation process

Closed-circuit transportation Running in parallel connection Brine transportation Intermediate pump station

Song-Lin CAO Bin-hua XU Tian-qiao ZHOU Yang LI Chao WEN

Hefei Tongyong Mechanical Research Institute, Hefei, Anhui 230031 Hefei Donghua Engineering Company, Hefei, Anhui 230031 Extraction and Transportation Management Bureau of Jiangsu Oil Field, Yangzhou, Jiangsu 225012

国际会议

9th International Symposium on Salt(第九届世界盐业大会)

北京

英文

613-619

2009-09-05(万方平台首次上网日期,不代表论文的发表时间)