SESIMIC MANAGEMENT AND SEISMIC HAZARD QUAN1TIFICATION AT KANOWNA BELLE MINE
Kanowna Belle Gold Mine is a seismically active mine with stoping below 1000m. Control of seismicity is critical to the future of the mine, both in terms of safety and economics. To achieve this a number of control systems have been put in place so as to manage seismicity on a mine wide scale down to day to development headings. This seismic management has been achieved through hazard quantification. Seismic hazard involves the study of the mines seismicity in conjunction with geological, Geotechnical settings and the layout and stoping method. The results of this work is the stoping sequence, planning implications, support system and other tertiary control systems.
RICHARD-P VARDEN
Senior Geotechnical Engineer,Kanowna Belle Mine, Barrick Gold Corporation Kalgoorlie, 6430, Western Australia
国际会议
The 7th International Symposium on Rockburst and Seismicity in Mines(2009年第七届国际岩爆与微振动性学术研讨会)
大连
英文
831-838
2009-08-21(万方平台首次上网日期,不代表论文的发表时间)