会议专题

RESEARCH ON THE ROCK BURST MECHANISM OF THE OVERALL REMOVAL OF COAL TUNNEL WALL IN DATONG COAL MINING AREAS THREE HARD COAL ROADWAY

By establishing the mathematical and mechanics model the coal tunnel wall can be pushed out overall into three hard coal roadways of Datong Coal Mining Area, this paper studies the mechanism of this type of rock burst. Under the condition of the separation of the seam and the roof, it is possible to have the coal wall vulnerably squeezed out and moved outward as a whole. This is because the vertical stress and the occurrence of coal as a whole is moved with very small demands.

XU-HONG WANG LI-XUNG RANG SHUANG-SUO YANG

College of Mining Technology, Taiyuan University of Technology Taiyuan, 030024, China

国际会议

The 7th International Symposium on Rockburst and Seismicity in Mines(2009年第七届国际岩爆与微振动性学术研讨会)

大连

英文

1311-1316

2009-08-21(万方平台首次上网日期,不代表论文的发表时间)