会议专题

Software Project Scheduling with Genetic Algorithms

The software project scheduling has the features of scheduling of projects with restrictions, the software development is a sequence of activities with order, it usually contains architecture, overall design,specific design, database design,interface design,testing and employment. There is a limitation for the developersworking time. In a nutshell, software project scheduling belongs to Resource-constrained project scheduling problem. This article uses the genetic algorithm to solve this problem,and find out a solution which can meet the goal.

Resource-constrained project scheduling problem Genetic Algorithms Software project Scheduling

LV Jianhong YANG Zhigang

Computer Engineering Department of Ordance Engineering Collage, Shijiazhuang, China, 050003 The Chinese Peoples Liberation Army 65581 Organizational Equipment Office, Siping, China

国际会议

第八届国际测试技术研讨会(8th International Symposium on Test and Measurement)

重庆

英文

3567-3570

2009-08-01(万方平台首次上网日期,不代表论文的发表时间)