A Bi-level Programming Decision Model for Time-Cost Trade-off Problem in Construction Supply Chain

A time-cost trade-off problem to optimize net revenue is considered in this paper to discuss the impact of an incentive plan combined with a lump sum contract on the determination of a project’s optimal duration. A bi-level programming decision model is proposed in the viewpoint of the client to discuss the optimal selection of the revenue incentive intensity so as to harmonize the benefit between the client and the contractor and reach a certain equilibrium state. A heuristic algorithm is developed. Furthermore, the influence of some factors on this equilibrium state is analyzed through a numerical example. Results show that revenue-based incentive mechanism is effective in object and benefit coordinating between the two parties of construction supply chain.

bi-level programming construction supply chain revenue incentive time-cost trade-off

Si-yun Chen Si-min Shen Jian-hua Chen

School of Logistics Engineering Wuhan University of Technology, P.R.China, 430063

国际会议

The Third International Conference on Operations and Supply Chain Management(第三届运营与供应链管理国际会议)

武汉

英文

354-359

2009-07-28(万方平台首次上网日期,不代表论文的发表时间)