Cost Estimation of Project Based on Principal Component Analysis
Cost estimation of project is one of the important tasks during the phase of feasibility study. Based on the theories and methods of principal component, this article uses SPSS statistic analysis software to have a principal component analysis on relevant variables influencing cost of a project in order to set up a multi-regression estimating model. With a good effect in test, regression analysis model of principal component also can avoid the poor stability of regression model caused by high relevance between or among different independent variables, so it is a cost estimation model with high value of practical utility and flexibility.
cost estimation principal component analyse multi-regression
Jianping Wang Zhiding Chen Ting Gao
School of Economics & Management China Three Gorges University, Yichang, 443002, 443002, Hubei province, China
国际会议
The Third International Conference on Operations and Supply Chain Management(第三届运营与供应链管理国际会议)
武汉
英文
708-711
2009-07-28(万方平台首次上网日期,不代表论文的发表时间)