会议专题

A PTAS for Minimizing Total Completion Time of Batch Scheduling Under Tree Precedence Constraints

We consider the bounded batch scheduling problem to minimize total completion time for jobs with release dates and identical processing time under tree precedence constraints. We give the first polynomial-time approximation scheme (PTAS) for the problem.

precedence constraints approzimation scheme scheduling

Ma Ran Han Xuefeng

College of Mathematics and Information Science Henan Polytechnic University Jiaozuo, Henan, 454000, China

国际会议

2009 WASE International Conference on Information Engineering(2009年国际信息工程会议)(ICIE 2009)

太原

英文

1020-1022

2009-07-10(万方平台首次上网日期,不代表论文的发表时间)