Hydrological Forecasting Real-time Adjustment Technique Based On Matriz Analysis
Zhanghe reservoir is connected by Guan Yinsi reservoir and Ji Gongjian reservoir through semi-natural open channel. Because of the complex influence factors, many flood forecast projects established did not come to applied level. This text adopts real-time adjustment technique based on matrix analysis. It basically avoids the calculating error problem, and establishes first-rate reservoir flood forecast project.
matriz analysis hydrological forecasting real-time adjustment
Song Yu Zongxue Xu Dan Li Tao Zhang
College of Water Sciences, Beijing Normal University, Beijing 100875, China State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University,Wuhan 4
国际会议
The Third International Workshop on Applied Matriz Theory(第三届国际矩阵分析与应用会议)
杭州
英文
1280-1283
2009-07-09(万方平台首次上网日期,不代表论文的发表时间)