会议专题

CASE STUDY ON 4000m-SPAN CABLE-STAYED SUSPENSION BRIDGE

This paper describes the case studies for a cable-stayed suspension bridges proposed over the Tsugaru Strait, Japan. Center Bridge is designed as a compound bridge of suspension bridges and cable-stayed bridges with 4000 m super-long-span. Case studies about the effects of cable-stayed bridge length, the design of sub-cable, height and stiffness of main tower, type of foundation and length of side span on displacement were carried out. With appropriate design of above parameters, the compound bridge can reduce horizontal displacement of main tower and vertical deflection in the central portion and can enhance resistance to partial loading. The paper reports the results from these case studies.

HUA WEI HAIJUN WANG

School of Civil Engineering Shenyang University of Technology, 110023, P.R.China

国际会议

The Third International Conference on Nwe Development in Rock Mechanics and Engineering(NDRM2009)(第三届国际岩石力学与工程新进展学术会议)

三亚

英文

505-508

2009-05-24(万方平台首次上网日期,不代表论文的发表时间)