EXPERIENCE FROM THE 300 MWe CFB DEMONSTRATION PLANT IN CHINA
This paper will describe the background and current status of the 300MWe CFB Demonstration Project located at the Baima Power Plant in Sichuan Province. This project was the first 300MWe class CFB in China and the first project built under the Transfer of Technology from Alstom. The plant entered commercial operation in early 2006. The fuel is a high-ash anthracite which has presented significant challenges in terms of higher-than-expected ash content and top size. While this fuel has been problematic for the adjacent suspension-fired boilers, performance in the CFB boiler has been excellent, with low carbon content in the ash, low turndown and low emissions. Key boiler performance parameters will be described along with a comparison of design and actual performance and the operational experience will be addressed. Finally, the paper will describe Alstoms process for scaling the CFB technology from 300MWe to 600MWe, and our supercritical CFB design.
CFB performances anthracite 300MWe
P.Gauvillé J.-C.Semedard S.Darling
国际会议
第20届国际流化床燃烧会议(20th International Conference on Fluidized Bed Combustion)
西安
英文
113-120
2009-05-18(万方平台首次上网日期,不代表论文的发表时间)