OPERATIONAL STATUS OF 300MWe CFB BOILER IN CHINA
China has the largest number of 300MW circulating fluidized bed (CFB) boilers in the word within, built in a short period of several years. Now, there are 13 CFB units in operating and other about 50 CFB boilers under construction or will be under construction soon. Summarization and analysis of the operational performance of the 300MWe CFB units are conducted. The reliability, economy and emission of these unite are introduced. The problems in these units are summarized. Some advices for improvement and future research are given.
300MWe-Class circulating fluidized bed boiler operation summary
J.F.Li J.H.Mi J.H.Hao S.Yang H.T.Huang H.M.Ji J.F.Lu G.X.Yue
Scientific and Technical Service Center, China Electricity Council, Beijing 100038, China Key laboratory for Thermal Science and Power Engineering of Ministry of Education, Department ofTher Key laboratory for Thermal Science and Power Engineering of Ministry of Education, Department of The
国际会议
第20届国际流化床燃烧会议(20th International Conference on Fluidized Bed Combustion)
西安
英文
243-246
2009-05-18(万方平台首次上网日期,不代表论文的发表时间)