Measures on the Emergency Repairs on Bao-Cheng Railway Tunnel 109#
This paper, based on the Emergency Repairs at Bao-Cheng Railway Tunnel 109#, presents the studies and analysis of major concepts, technical proposals and key problems encountered in conducting emergency works to set the target of resuming traffic within a short period of time and maintaining safety on a long run by phased performances, which can be taken as references to guide emergency works for railway projects under similar natural disasters.
Bai-Chene railway line 109# tunnel Emergency repair Urgent traffic resuming Line relocation
Shuanglin Huang
China Railway First Survey & Design Institute Group Co., Ltd, Xi an, Shaanxi, 710043
国际会议
The First Anniversary of Wenchuan Earthquake(纪念汶川地震一周年国际学术会议)
成都
英文
584-588
2009-05-10(万方平台首次上网日期,不代表论文的发表时间)