Remedial Measures against Gaojiaping Landslide for the Relocation of Tunnel 109# on Baocheng Railway
Due to the serious destruction on railway projects adjacent to the epicenter of 5 · 12 Wenchuan Earthquake, the tunnel 109# on Baoji-Chengdu Railway, leading to the southwest of China, is collapsed to disrupt the service of the whole line, so the railway rescue therefore has caught the attention throughout the country. The remedy of Gaojiaping landslide for relocation is an emergency rescue project which takes high challenges in special environment conditions, including unremitting aftershocks, stone rolling and falling, and unceasing heavy rain, on the condition that the existing railway can operate smoothly.
Landslide Stability analysis Control methods
Suoping Li Shijun Tian Xiangyang Wang
China Railway First Survey & Design Institute Group Co., Ltd, Xian, Shaanxi, 710043 China Railway First Survey & Design Institute Group Co., Ltd, Xi an, Shaanxi, 710043 China Railway First Survey & Design Institute Group Co., Ltd,Xian, Shaanxi, 710043
国际会议
The First Anniversary of Wenchuan Earthquake(纪念汶川地震一周年国际学术会议)
成都
英文
600-603
2009-05-10(万方平台首次上网日期,不代表论文的发表时间)