会议专题

Modeling and Optimization of Hull Building Process Based on P-TPN

Due to the low efficiency of hull building, this paper applies Timed Place Petri net to model and optimize the process of hull construction scheduling. We adjust the Orientation Block, eliminate the Hatch Coaming Section, repartition the complicated blocks and reduce the construction difficulty. Modularization building and flow line construction are realized for most blocks. The result shows the efficiency has been enhanced greatly. Finally, according to the reasonable existing time of the markings, whether a given construction state is on rational construction schemes can be judged.

Yongquan Zhang Kelin Xu Xudong Hong

School of Mechanical Engineering, Tongji University, Shanghai 201804, China

国际会议

The Second International Joint Conference on Computational Science and Optimization(CSO 2009)(2009 国际计算科学与优化会议)

三亚

英文

2039-2042

2009-04-24(万方平台首次上网日期,不代表论文的发表时间)