会议专题

Efficient and Stable Cleaning Steel Production Platform-Brief Introduction to Steelmaking Plant of SGJT Project

The steelmaking plant of the Iron and Steel project is integrated with the advanced steelmaking technology and builds an efficient and stable production platform for clean steel by adopting the completely new process flow. By adopting the process route of LDT transportation of the hot metal, full tri-de pretreatment of hot metal, little slag smelting with a high speed and 100% refining treatment of molten steel, the steelmaking plant lays the first stone for realizing the high efficiency of continuous casting. Lots of mature and reliable advanced technologies are adopted for the continuous casting system, which can make the hope of realizing the best quality and the high efficiency of the capacity of the products.

production platform for clean steel full tri-de high efficiency continuous casting advanced technology

YANG Chun-zheng LIANG Hong-bing

Shougang Jingtang United Iron & Steel Co.Ltd.Tangshan 063200

国际会议

第四届发展中国国家连铸国际会议(The 4th International Conference on Continues Casting of Steel in Developing Countries)

北京

英文

38-46

2008-11-04(万方平台首次上网日期,不代表论文的发表时间)