OPTIMIZATION OF ELEVATOR GROUP CONTROL SCHEDULING WITH MULTI-STRATEGY SWITCH
Research on the elevator group control strategy has important significances towards to improving efficiency and reducing energy consumption of elevators. In order to optimize the performance of elevator group control system (EGCS) and offer excellent service to passengers, the elevator group control scheduling method based upon known-waiting passengers and multi-strategy switch is proposed in the paper. The number of the passengers who are waiting for elevators can be obtained through detecting device, which is called passive pyroedetric infrared sensor device for body detection. The feasibility of the scheme is validated by subarea experiment. In this way, the traffic mode of the EGCS can be judged in real time. There are two scheduling algorithms based on fuzzy control theory developed in the paper. The multi-strategy switch method is used to schedule elevators when there is new call according to traffic. So the optimization allocation of scheduling algorithm is realized. The results show that the performance indices of EGCS are optimized and the efficiency of EGCS is improved.
Elevator group control Known-waiting passengers Scheduling Fuzzy control Traffic mode
HAI-YAN TANG BAO DING WEI-GUI QI YONG-MING ZHANG
Department of Electrical Engineering and Automation, Harbin Institute of Technology, Harbin, 150001, China
国际会议
2008 International Conference on Machine Learning and Cybernetics(2008机器学习与控制论国际会议)
昆明
英文
2067-2072
2008-07-12(万方平台首次上网日期,不代表论文的发表时间)