Analyzing the Slumping Process of the Cooling Tower by Analyzing Blasting Vibration Wave in Actual Measurement

A 90m height cooling tower at Datang power plant in Songyuan city, Jilin Province was demolished by blasting its poles and cracking its residua by machine after that. In the process of blasting, it inversely researched the course of kinesis of 90 m height cooling tower sitting in situ by monitoring blasting vibration and analyzing wave of vibration and studying real blasting size of poles, it has disclosed that the cooling tower has undergone five procedures: blasting, yield destabilization, free falling,imperfection impact and entire crash, and every procedure duration has been presented also. It is a very effective research means by analyzing blasting vibration to study kinesis and stress for such instant problem as explosion and shock waves

cooling tower sitting in situ inversely analysis by vibration

LIU Yi FU Jianqiu WEI Xiaolin

Guangdong Handar Basting Engineering Co., Ltd.Guangzhou, China

国际会议

The Second Asian-Pacific Symposium on Blasting Techniques(第二届亚太地区爆破技术研讨会)

大连

英文

568-573

2009-07-01(万方平台首次上网日期,不代表论文的发表时间)