From Bridges across Great Belt and (O)resund towards a Femern Belt Bridge

In Denmark the construction of three major bridges was initiated in the 1990s: Storebaelt Bridge (Great Belt Bridge), (O)resund Bridge and Femern Belt Bridge. The first two were completed in 1998 and 2000, respectively, and the third is expected to be constructed during the second decade of the 21 st century. In both design and construction procedures a number of innovative features have been introduced.