会议专题

Numerical Simulation of Influence of Different Time of Shutdown on Casing Stress in Thermal Recovery Well

The influence of different time of shutdown on casing stress in thermal recovery well was studied by numerical simulation based on theory of Thermal-Mechanical coupling. The simulation results shown that the longer the time of shutdown, the greater the decline in value of casing stress, then the casing stress was greater when continuing to inject steam to the stabilized state of the casing, so the shutdown had greater impact on casing security. The simulation results are very helpful to choose a reasonable time of shutdown and the casing protection in oil fields.

steam huff and puff casing stress Thermal-Mechanical coupling numerical simulation

ZHENG Chao LIU Jian-jun

Institutes of Poromechanics, Wuhan Polytechnic University, Hubei Wuhan, 430023, China

国际会议

2009 International Forum on Porous Flow and Applications(第十届全国渗流力学学术会议)

武汉

英文

714-718

2009-04-26(万方平台首次上网日期,不代表论文的发表时间)