Research on Reservoir Leakage through the Right-Bank Basalt of Hengshan Hydro-project
Research on reservoir leakage is an important subject in water resources and hydropower project. Serious leakage problem has been found since the dam is constructed for Hengshan hydro-project in Changbai county, Jilin province. The path, range and mechanism of the reservoir right-bank leakage have been basically found out. The quantity of leakage which is calculated by fissure seepage theory is basically the same as the measured result. It shows that the reservoir leakage is through fissures and joints well-developed in basalt and provides a scientific basis for the design of curtain grouting of the reservoir.
Hengshan hydro-project basalt layer reservoir leakage fissure flow
XIAO Changlai QI Wenbiao LIANG Xiujuan
College of Environment and Resources, Jilin University, Changchun, 130026 Jilin Province Water resources and Hydropower Investigation and Design Institute, Changchun, 120021
国际会议
2009 International Forum on Porous Flow and Applications(第十届全国渗流力学学术会议)
武汉
英文
877-881
2009-04-26(万方平台首次上网日期,不代表论文的发表时间)