Study on Seepage Control for Sluices and Dams on Thick Overburden Layer

According to some typical projects, this paper compares and analyzes the effective-ness of different seepage control measures, and mainly studies the seepage control effective-ness of cutoff wall with different locations and penetration depth with numerical simulation technology. Results show that the site of vertical anti-seepage measurement should Close to the upstream as much as possible, and the hydraulic gradient at the Key parts such as the in-take and outlet of groundwater is considerable, it is necessary to set sheet piles or short cut-off walls at these critical locations.

Thick overburden layer suspended cutoff wall penetration depth

Xie Luofeng Duan Xiangbao Zhou Chunxu

Nanjing Hydraulic Research Institute,Nanjing 210029,China Nanjing Hydraulic Research Institute, Nanjing 210029,China Nanjing Hydraulic Research Institute, Nanjing 210029,China Nantong Shipping College, Nantong 226010,

国际会议

International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会)

南京

英文

95-99

2008-10-22(万方平台首次上网日期,不代表论文的发表时间)