Calculation of Landside Seepage Berm Range of Danger Control and Reinforcement Optimizing Scheme on the Left Auziliary Dam of Xinjiang Wuyi Reservoir

Wuyi Reservoir is a sick dam of reinforcement reservoir. According to the seepage safety analysis on the left auxiliary dam in the dam reinforcement project, the authors hold that the protective scheme of combining reversed filter drainage and landside seepage berm and reinforcing seepage exits can replace the vertical anti-seepage wall processing. This paper emphasizes the calculation and analysis of landside seepage berm in the optimizing scheme.

Reinforcement optimizing seepage berm

Long Zhifei Ta Keman Wang Zhaosheng

Nanjing Hydraulic Research Institute,Nanjing 210029, China Xinjiang Bohe River Valley Administrative Bureau, Xinjiang Bole City,833400 Nanjing Hydraulic Research Institute, Nanjing 210029, China