会议专题

Review on Dam Seepage Security of Yellow River Wanjiazhai Multi-purpose Water Project

This paper based on seepage observation data conducts a comprehensive analysis on the dam seepage security of Wanjiazhai multi-purpose water project. The conclusion is that the dam foundation uplift pressure meets the design requirements, the bypass seepage of left and right abutments is basically stable, not affecting the safety of project, and the dam seep-age state is overall secure.

Wanjiazhai seepage security

Long Zhifei Wang Dong Wang Zhaosheng

Nanjing Hydraulic Research Institute, Nanjing 210029, China Yellow River Wanjiazhai Water Multi-Purpose Dam Project Co., Ltd., Taiyuan 030000, China

国际会议

International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会)

南京

英文

430-440

2008-10-22(万方平台首次上网日期,不代表论文的发表时间)