会议专题

Web Technology-based General Automation System Integrating Plan of Yanshan Reservoir

As one of the 19 main projects determined by State Council to renovate Huaihe Riv-er, Yanshan Reservoir must establish general automation system, so it will be an absolutely necessary means and platform to realize reservoir run scientifically under digital, information and modern management condition. By selecting reliable software and hardware, as well as the development of system, using each technical measure controlled by modern computer,each subsystem, i.e. safety monitoring of Yanshan Reservoir, water and rainfall situation,monitoring of sluice gate, video frequency monitoring, MIS at hydropower station and office automation will be integrated, it has significant meaning to realize resources share, scientif-ic adjustment, use water resource reasonably and make engineering benefit work sufficiently.

General automation system WEB technology integrating plan system function

Ma Fuheng Shi Shikui Liu Chengdong

Nanjing Hydraulic Research Institute,Nanjing 210029, China Henan Yanshan Reservoir Construction Management Bureau, Yexian 467224, China Nanjing Hydraulic Research Institute, Nanjing 210029, China

国际会议

International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会)

南京

英文

661-666

2008-10-22(万方平台首次上网日期,不代表论文的发表时间)