Analysis on Dam Monitoring Displacements of Changma Reservoir
The Changma Reservoir is located in the Shule River Basin. Dam Monitoring Dis-placements includes external deformation and internal deformation (vertical, horizontal). In-ternal vertical deformations were observed by water level settlement gauge; horizontal de-formations were observed by horizontal displacement gauge; three incline holes were laid on the top of dam to observe horizontal deformation; the mountain displacements on the right of dam were observed by inclinometer tube (for horizontal displacements) and multi-point ex-tensometer (for vertical displacements). The results showed that the dam and mountain dis-placements were all within allowable value of standard and design, but they did not reach sta-tionary phase. At this period, the dam was in secure running state. This paper proposes some problems and gives some suggestions which are helpful to the following monitoring work.
Multi-point eztensometer incline holes monitoring
Zhang Junxia Lan Yan Zhao Shougang Li Li
Yellow River Institute of Hydraulic Research,Research Center on Levee Safety Disaster Prevention, Ministry of Water Resources
国际会议
International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会)
南京
英文
685-689
2008-10-22(万方平台首次上网日期,不代表论文的发表时间)