A Simplez New Approach of Accounting Inflow Flood Hydrograph of Reservoir
This paper has detailedly analyzed rainfall, water-level and outflow hydrograph ac-cording to the over-dam inflow flood. The inflow flood recurrence interval was evaluated,and the coordinate of outflow peak that stands falling segment of the inflow hydrograph was found. The paper has pointed out why it is illogical that using water-balance account inflow flood hydrograph. It is most important that the paper has obtained a simplex triangle method of accounting inflow flood of the reservoir, gave out steps and discussed conditions. Special-ly, the result and analytical method in paper is referenced to supervisor and designer for mountain reservoirs.
Reservoir inflow flood of reservoir triangle method of accounting flood hydro-graph over-dam flood reservoir operation basin lag the coordinate of outflow peak
Fang Chonghui Guo Shenglian Duan Yahui Yang Xinming
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan Hubei Water Resources Bureau, Wuhan 430071, China
国际会议
International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会)
南京
英文
717-722
2008-10-22(万方平台首次上网日期,不代表论文的发表时间)