STRATEGY OF FLOOD CONTROL IN TAIHU BASIN

The rapid economical and social development in Taihu Basin proposes higher requirements on flood control and public security. Current flood control situation in Taihu Basin is briefly analyzed. 1991 and 1999 rainfalls are more serious than 1954 rainfall, which is the current design standard. In addition, incessancy waterproof land use and water surface reclamation increase flood control difficulty. Taihu basin hydrodynamic numerical model is set-up, which consists of runoff module and l-dimensional unsteady river network flow module. Based on present key projects, following the drainage frame of northward to Yangtze River, eastward to Huangpu River and southward to Hang Zhou Bay, and considering storage and drainage ability as a whole, Taihu Basin flood control strategy is brought forward. Based on Taihu basin hydrodynamic numerical model, flood control ability of the planning works is evaluated. It shows that the flood control strategy can increase the ability of out-lake flood and reduce flood water level of Taihu Lake and plain region substantially.

Taihu lake Taihu Basin Flood control

Zheng Gong Zexin Lin

Hohai University, Nanjing, 210098, China Taihu Basin Authority of Ministry of Water Resources, Shanghai, 200434, China

国际会议

第16届亚太地区国际水利学大会暨第3届水工水力学国际研讨会(16th IAHR-APD Congress and 3rd Symoposium of IAHR-ISHS)

南京

英文

1011-1016

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)