STUDY ON HYDRAULIC CALCULATION AND CLOSURE TECHNIQUE FOR SEA RECLAMATION WORKS

For reasonable determination of the sequence, method, and optimum scheme for closure works, a study is performed on the regularity of variation of hydraulic factors at the entrance of sea reclamation works based of the water quantity balance equation. The results show that the size of a closure gap should be determined based on the control flow velocity of typical tide current during flood seasons, meanwhile, the gap bed and jetty head should be well protected, which the sequence and method for gap closure works should be determined based on the contour of the maximum flow velocity of a typical flood tide current during non-flood seasons. The wide shallow entrance and multi-section should be used in gap closure works on soft foundation with the maximum velocity set at the foot of section slopes, meanwhile, protection measures should be strengthened and the optimum technical scheme for gap closure works should meet the requirements of the minimum engineering quantity, easy organization and management during construction and also the realization of closure during a neap tide.

sea reclamation works gap closure sequence of closure horizontal-vertical closure

Dechun Chen Hen He

College of Traffic and Ocean Engineering, Hohai University, China College of Water Conservancy and Hydropower Engineering, Hohai University, China

国际会议

第16届亚太地区国际水利学大会暨第3届水工水力学国际研讨会(16th IAHR-APD Congress and 3rd Symoposium of IAHR-ISHS)

南京

英文

1288-1293

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)