会议专题

DISCUSSION OF RESETTLEMENT COST EXTERNALIZATION OF WATER RESOURCES AND HYDROPOWER PROJECTS

The construction of water resources and hydropower projects will inevitably give rise to a large number of reservoir resettlement. Pursuant to the prevailing Preparation Method and Calculation Standard of Design Estimate for Hydropower Projects, some resettlement costs have been externalized. Thus, the conclusions from project financial evaluation might be distorted, making it difficult for decision-makers to make the right decision on project feasibility; on the other hand, the resettlement compensation level is low, imposing the economic and social costs incurred by construction on the migrants unfairly and leading to poverty. This article discusses the composition of resettlement costs of water resources and hydropower projects, and analyzes the externalized resettlement costs, including those not included in the prevailing cost standard for reservoir resettlement and those entirely excluded.

water resources and hydropower projects resettlement costs ezternalization

Shaojun Chen

Hohai University, 1 Xikang Road, Nanjing, China

国际会议

第16届亚太地区国际水利学大会暨第3届水工水力学国际研讨会(16th IAHR-APD Congress and 3rd Symoposium of IAHR-ISHS)

南京

英文

1427-1432

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)