Case Study on the Funds-payment of Power Construction Commissioned Management Project

This paper took a 2×600MW supercritical generating electricity project as an example. It analyzed the contract construction system and the funds-payment problems, compared with the other construction project. Meanwhile, this paper analyzed the advantage and disadvantage of the difference fund payment method and gave a proposal of engineering fund management. It will help owner to manage the generating electricity project under agent model that was gradually extended to the power construction project.

commissioned management contract management generating electricity construction engineering fund

Liu Rui Wang Xiaoya Zhang Yuqing

School of business administration North China Electric Power University Beijing, China