Risk informed Management for the Outage Optimization Using PSA

1IntroductionConventionally,since before being used the PSA evaluation,the shutdown safety management with the deterministic approach inside the technical specifications has been enforced mitigate its consequences in order to prevent the trouble or mitigate its consequences. In addition,the importance of safety control during plant shutdown has attracted much attention,spurred by many event reports including house those from Diablo Canyon and Vogtle nuclear power plants in the US. Though risk present in midloop operation is unique to PWR plants,fortunately no significant event has occurred at PWRs in Japan so far.Even with such operating result as this,taking into account recent distrust of the public on nuclear safety in Japan,any trouble occurred during plant shutdown should impair public confidence toward nuclear power generation,as well as lead to more restricted regulations. Therefore,it is critical to prevent occurrence of any safety-related events during shutdown period.

PSA Core Damage Frequency Risk Informed Management Shutdown Outage Risk Event Tree Linking Method Risk Monitoring System

Kenji Murayama Norihisa Hashida Takahiro Kuramoto Kei Ohya

Nuclear Safety Engineering Group, The Kansai Electric Power Company, Fukui, Japan Design Service Department, Nuclear Engineering, Ltd., Osaka, Japan

国际会议

ISSNP2008、CSEPC、ISOFIC2008(第二届21世纪和谐核电系统国际会议、第四届电厂控制中认知系统工程方法国际会议暨第三届未来核电厂仪表与控制国际会议)

哈尔滨

英文

636-640

2008-09-08(万方平台首次上网日期,不代表论文的发表时间)