Grey Relation Analysis of Cost Infection Factors in Engineering Project
On the basis of the cost infection factors in engineering project,we establish evaluation model. According to relativity analysis method in grey systems theory, we expatiate basic process of evaluation cost infection factors by a case from construction project. The result shows, these methods could find the main relations among factors and important factors of affecting the aimed value through certain data process in uncompleted information, and makes decision of simple, ocular and rational features.
grey relation analysis cost infection factors evaluation project
Yang Linquan Zhou Long
The research Center of Systems Engineering,Yunnan University,Kunming 650091
国际会议
2008年国际应用统计学术研讨会(2008 International Institute of Applied Statistics Studies)
烟台
英文
1-6
2008-08-14(万方平台首次上网日期,不代表论文的发表时间)