会议专题

Research on the Self-healing Waterstop of Perimeter Joint of Jilintai-I CFRD

1 Project generalizationJilintai-1 hydropower station is the tenth station in the planning of Kashi River basin, which is32km from Nileke County in west direction and located in the middle part of Jilintai gorgewhere Kashi River passing. For the said water power station, the total installed power capacity is460MW, the total storage capacity is 2.53 billion m3, the design flood water level is 1420.0m andthe dead water level is 1380.0m. The dam is concrete face sandy gravel rockfill dam with theheight of 157m and with 445m of crest length. The upstream face slope of which is 1:1.7 and thedownstream face slope is 1:1.96. To the dam face slab, area is 75250m2, the maximum sidelinelength is 256.7m.

Lu Yihui He Xusheng Hao Jutao

China Institute of Water resources and Hydropower Research(IWHR),Beijing

国际会议

2007年中国高坝关键技术交流会(Workshop on High Dam Know-How 2007 China)

宜昌

英文

53-61

2007-05-22(万方平台首次上网日期,不代表论文的发表时间)