Brief Introduction to Sand-gravel Dam Seepage Control Construction Technologies for Xiziayuan Counter Reservoir with Inclined Compound Geomembrane Core
1 Project BriefThe Xixiayuan Counter Reservoir is located on the mainstream of the Yellow River in HenanProvince, 16km downstream of Xiaolangdi Multipurpose Dam Project, with a total catchmentarea of 694,600km2 above the dam site. This is a large-sized multipurpose dam project mainlyfor counter regulation, but also for power generation, water supply and irrigation, with a totalstorage capacity of 162 million m3, a maximum height of 20.2m in the sand-gravel section and51.5m in the concrete section, a total installed capacity of 140MW, and an irrigation area of1.138 million mu.
Wang Dengke Yang Tao Ma Wei Zhang Guolan Wang Peixi
Xiaolangdi Engineering Consulting Co.,Ltd. Yellow River Engineering Consulting Co.,Ltd. SINOHYDRO Engineering Bureau 11
国际会议
2007年中国高坝关键技术交流会(Workshop on High Dam Know-How 2007 China)
宜昌
英文
72-79
2007-05-22(万方平台首次上网日期,不代表论文的发表时间)