Construction Practice of CFRD of Upper ReserVoir of Yizing Pumped-storage Power Plant
The main dam of the upper reservoir of Yixing Pumped-storage Power Plant, as areinforced concrete faced rock-filled dam built on the tilted foundation surface, is rare at homeand abroad in its type whose stress and deformation traits are in accordance with the general law. The deformation of upper reservoir of the main dam of Yixing Pumped-storage Power plant issmaller in all CFRD in China, and the amount of the impervious faceplate cracks is less than thatof the same type project, it shows that the design of main dam is reasonable and advanced, andthe construction is high quality.
Yizing Pumped-storage Power Plant upper reservoir faceplate rock-filled dam
Gong Qianliang
No.2 Engineering Co.Ltd of Gezhouba Group Corporation,Yichang,China
国际会议
2007年中国高坝关键技术交流会(Workshop on High Dam Know-How 2007 China)
宜昌
英文
89-100
2007-05-22(万方平台首次上网日期,不代表论文的发表时间)