Principium and Influencing Factors of Insulating Menstruation of Water-cooling Generator
1 IntroductionThe stator insulation mensuration of large scale water-internal-cooling hydro-generator candiscover the insulation defect of the stator coil effectively, and also its easy to judge theinsulation status is good or not by checking the leaking current. Therefore theyre the significantinstrument to insure the safety and stabilization of running generators.As the hydro-generators in the Three Gorges Hydropower Plant (TGHP) adopt water-internal-cooling way for stator cooling, their stators insulation mensuration are differ from the air-coolinggenerator for the influence of water loop.
Huang Lei
China Yangtze Power Corporation Ltd.,Yichang city,443002
国际会议
2007年中国高坝关键技术交流会(Workshop on High Dam Know-How 2007 China)
宜昌
英文
121-125
2007-05-22(万方平台首次上网日期,不代表论文的发表时间)