会议专题

The optimal research of reinforcement measures in the second dam of Huangbizhuang Reservoir

The second dam of Huangbizhuang Reservoir is in the key position of flood control and at the same time it is also the most dangerous building with the most problems. It is a homogeneous dam with length of 6907.3m and crest elevation of 19.2m. The artificial horizontal blanket to prevent seepage brings about serious leakage which causes sand emits, collapses the pit and leakage downstream dam and the situation is worsens day by day. Such problems as dam cracks and sinks could not be solved though it has been more than 20 times of reinforcement, remedy, thicken and lengthen. The crest associated-vertical impervious scheme which was analyzed and demonstrated sufficiently, was adopted and a concrete cutoff wall of 300,000 m2 was built and excellent result was obtained.

earth dam measure reinforcement cutoff wall optimal design

Gu hui

Hebei Research Institute of Investigation&Design of Water Conservation&Hydropower Tianjin 300250

国际会议

2005年大坝安全与堤坝隐患探测国际学术研讨会(International Symposium on Dam Safety and Detection of Hidden Troubles of Dams and Dikes)

西安

英文

1-14

2005-11-01(万方平台首次上网日期,不代表论文的发表时间)